appleibeats
Member
- Joined
 - Oct 30, 2012
 
- Messages
 - 375
 
- Gender
 - Male
 
- HSC
 - 2016
 
Re: Year 11 Mathematics 3 Unit Cambridge Question & Answer Thread
Water is leaking out through a hole in the bottom of a bucket at a rate dv/dt =-8(25 - t), where v cm^3 is the volume of liquid in the bucket at time T seconds
Initially there was 2 1/2 litres of water in the bucket. Find v in terms of t, and hence find the time taken for the bucket to be emptied.
	
		
			
		
		
	
								Water is leaking out through a hole in the bottom of a bucket at a rate dv/dt =-8(25 - t), where v cm^3 is the volume of liquid in the bucket at time T seconds
Initially there was 2 1/2 litres of water in the bucket. Find v in terms of t, and hence find the time taken for the bucket to be emptied.
				